ST.PETERSBURG
Troitsky bridge
The bridge is located in historical centre of St.Petersburg and joins Marsovo Pole and Peter & Paul Fortress. All bridge spans have been coated. Abrasive (copper slag) was collected from the flooring surface by vacuum unit and was removed for recovery. Thus, we managed to avoid ingress of 2,100 tons of abrasive to Neva river. In view of time constraints, works have been completed during winter months (at temperature up to -18°C). Therefore, air within working zone was heated and dried. Area of sandblasting and painting: 70,000 sq.m.
Aleksandra Nevskogo bridge
Western companies paving «cast asphalt» on Russian bridges invite us for surface preparation and priming. They are aware that as a result they will receive cohesion of thin asphalt layer with the bridge metal of premium quality. Area of surface preparation for asphalt laying: 2,000 sq.m.
Bolsheokhtinsky bridge
Area of surface preparation for asphalt laying: 28,970 sq.m.
LENINGRAD REGION
Bridge across Syas river
Area of sandblasting and painting: 14,680 sq.m.
Bridge across Luga river near Kingisepp
Area of sandblasting and painting: 5,500 sq.m.
Bridge across Volkhov river
Area of sandblasting and painting: 9,980 sq.m.
Bridge across Luga river, 169 km
Area of sandblasting and painting: 9,000 sq.m.
Saimensky Channel, Viborg
Area of sandblasting and painting: 13,000 sq.m.
BW (Beltway)
Motorway «Russia – Priozersk» Area of sandblasting and painting: 42,536 sq.m.
Pargolovo station Area of sandblasting and painting: 12,000 sq.m.
Gorskaya station Area of sandblasting and painting: 30,000 sq.m.
Picket 1123 Area of sandblasting and painting: 12,000 sq.m.
ARKHANGELSK REGION
Bridge across Onega river, Severodvinsk
Area of sandblasting and painting: 5,960 sq.m.
MOSCOW
Butovo metro
«Overhead» metro line in Southern Butovo: 4 km of metal structures at height 7 meters above ground level. Metro line is laid along existing boulevard. Works have been performed over existing city streets. There was a necessity to do containment for working zone due to stringent requirements on noise level, dust content and overspray. Area of sandblasting and painting: 189,000 sq.m.
MOSCOW REGION
Bridge across Moskva river, Tuchkovo settlement
Area of sandblasting and painting: 2,200 sq.m.
OMSK REGION
Metro bridge across Irtish river, Omsk.
Necessity to complete a large scope of works during one season demanded us to arrange a 24-hour schedule and high executive discipline. Bridge spans have been containment completely. Used abrasive was collected and used for backfilling of temporary road. Area of sandblasting and painting: 169,000 sq.m.
Bridge across Irtish river at Omsk detour
Area of sandblasting and painting: 114,650 sq.m.
VOLOGDA REGION
Bridge across Sukhona river at Totma
Area of sandblasting and painting: 33,500 sq.m.
Bridge across Sukhona river at Veliky Ustyug
Area of sandblasting and painting: 8,000 sq.m.
Bridge across Sukhona river
Area of sandblasting and painting: 26,800 sq.m.
Bridge across Sheksna river
Area of sandblasting and painting: 5,220 sq.m.
VOLGA REGION
Bridge overpass across Volga river at Pristannoye village, Saratov region
Reconstruction of Saratov – Ust-Kurdym motorway, overpass across Guselka river
Area of sandblasting and painting: 71,000 sq.m.
Bridge across Volga river, Ulyanovsk
Area of sandblasting and painting: 25,000 sq.m.
Bridge across Cheremshan river, Dimitrovgrad
Area of sandblasting and painting: 19,158 sq.m.
Bridge across Kazanka river, Kazan
Area of pre-treatment for asphalt laying: 14,000 sq.m.
NORTHERN CAUCASUS
Bridge across Baksan river, «31+105 km»
Area of sandblasting and painting: 1,576 sq.m.
Bridge across Baksan river «145+569 km»
Area of pre-treatment for asphalt laying: 1,296 sq.m.
Bridge across Maly Zelenchuk river, Cherkessk
Area of sandblasting and painting: 4,200 sq.m.
Bridge across Gundelen river, Pyatigorsk
Area of sandblasting and painting: 1,300 sq.m.
BELARUS
Bridge across Sosh river, Krichev
Area of sandblasting and painting: 8,582 sq.m.
Bridge across Pripyat river, Mozir
Area of sandblasting and painting: 12,144 sq.m.
Bridge across Berezina river, Bobruisk
Area of sandblasting and painting: 8,400 sq.m.
Bridge across Zapadnaya Dvina river, Vitebsk
Area of sandblasting and painting: 3,484 sq.m.
Bridge across Dnepr river, Shklov
Area of sandblasting and painting: 3,140 sq.m.
Bridge across Dnepr river, Orsha
Area of sandblasting and painting: 7,880 sq.m.
Bridge across Dnepr river, Bikhov
Area of sandblasting and painting: 3,800 sq.m. |