|



Bulk Oil Terminal, Primorsk, seaport |
Bulk Oil Terminal, Primorsk, seaport
Tubular piles and sheet piling were pre-treated and painted for construction of bulk oil terminal in the port. Temporary slipways and painting shelters near the object area were designed and assembled to observe required parameters of air temperature & moisture content for painting. The length of tubular piles up to 28 m, diameter 1,200 mm. The total area of sandblasting and painting: 49,500 sq.m.
|